Issue |
ITM Web of Conferences
Volume 6, 2016
6th Seminar on Industrial Control Systems: Analysis, Modeling and Computation
|
|
---|---|---|
Article Number | 03016 | |
Number of page(s) | 4 | |
Section | Systems analysis | |
DOI | https://doi.org/10.1051/itmconf/20160603016 | |
Published online | 25 March 2016 |
Results of agile project management implementation in software engineering companies
1 Moscow Technological Institute, 119334 Moscow, Russia
2 State University of Management, 109542 Moscow, Russia
a Corresponding author: s_suetin@mti.edu.ru
Agile project management methodologies, tools and techniques have been becoming more and more popular among Russian and foreign software companies. Though the agile software project management methodologies appear to be more flexible and sound alternative to traditional project management approaches, the practice of agile project management implementation needs more research. The article presents the research on the practical results of agile project management implementation in Russian software engineering companies. The survey-based study covers 8 companies and 35 their projects managed with the help of agile methodologies. In contrast to some optimistic researchers of agile practices, the research findings show that in the investigated projects agile project management led to the deterioration of cost and schedule performance. However, the quality, both perceived by clients and assessed by internal technical analysts, improved after the implementation of agile software project management practices.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.