Analysis of possibility of shorted coil localization in power transformer on the basis of its frequency response (SFRA)
Poznan University of Technology, M. Sklodowskiej-Curie Sqr. 5,
60-965
Poznan, Poland
* Corresponding author: kamil.wo.lewandowski@doctorate.put.poznan.pl
The article presents the results of transformer investigation using SFRA method. The 630 kVA unit with the Dyn5 connection system were investigated. The characteristics of the frequency response for the transformer without defect and with the shorted turns implemented defect were presented and analyzed. The shorted turns was performed in various parts of the HV transformer’s winding in order to check the possibility of localization of this defect. The measurements were carried out in four different ways: measurement of the frequency response of the tested winding with shorted and on free potential line terminals of the remaining windings, and inter-winding measurement − inductive and capacitive. Based on the obtained results, the influence of the shorted turns location in the transformer on its frequency response was evaluated.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.