Open Access
Issue
ITM Web of Conferences
Volume 6, 2016
6th Seminar on Industrial Control Systems: Analysis, Modeling and Computation
Article Number 03002
Number of page(s) 4
Section Systems analysis
DOI https://doi.org/10.1051/itmconf/20160603002
Published online 25 March 2016
  1. G. Bubnov, S. Titov, B. Titarenko and R. Titarenko, Contemporary Engineering Sciences, 8, 991 (2015) [Google Scholar]
  2. B. Titarenko, S. Titov and R. Titarenko, PM World Journal, 4, 1 (2015) [Google Scholar]
  3. M. Röglinger, J. Pöppelbuß and J. Becker, BPMJ, 18, 328 (2012) [Google Scholar]
  4. T. De Bruin and M. Rosemann, Proceedings of the Thriteenth European Conference on Information Systems, ECIS (2005) [Google Scholar]
  5. Software Engineering Institute, CMMI® for Development, v1.3. (Carnegie Mellon University, 2010) [Google Scholar]
  6. B. Curtis, J. Alden and C.V. Weber, The Use of Process Maturity Models in Business Process Management (Borland Software Corporation, 2004) [Google Scholar]
  7. М. Aubakirov and E. Nikulchev, International Journal of Advanced Computer Science and Applications, 7 (2016) [CrossRef] [Google Scholar]
  8. I.V. Osipov, E. Nikulchev, A.A. Volinsky and A.Y. Prasikova, International Journal of Advanced Computer Science and Applications, 6, 71 (2015) [Google Scholar]
  9. M. Scott, PM World Today, 11, 23 (2009) [Google Scholar]
  10. Software Engineering Institute, The Capability Maturity Model: Guidelines for Improving the Software Process (Addison-Wesley, 1995) [Google Scholar]
  11. Software Engineering Institute, A Systems Engineering Capability Maturity Model. v1.1 (Addison-Wesley, 1995) [Google Scholar]
  12. B. Curtis, B. Hefley and S. Miller, People Capability Maturity Model (P-CMM) Version 2.0 (Carnegie-Mellon University, 2009) [Google Scholar]
  13. Y.H. Kwak and W. Ibbs, J Manage Eng, 18, 150 (2002) [CrossRef] [Google Scholar]
  14. H. Kerzner, Strategic Planning for Project Management Using a Project Management Maturity Model (Wiley, 2001) [Google Scholar]
  15. R. Sowden, D. Hinley, & S. Clarke, Portfolio, Programme and Project Management Maturity Model, v2.1 (2010) [Google Scholar]
  16. Project Management Institute, Organizational Project Management Maturity Model (OPM3). Knowledge Foundation (2003) [Google Scholar]
  17. Project Management Institute, A Guide to the Project Management Body of Knowledge (2010) [Google Scholar]
  18. Project Management Institute, The Standard for Portfolio Management (2013) [Google Scholar]
  19. Project Management Institute, The Standard for Program Management (2013) [Google Scholar]
  20. L. O’Brian, B. Britt, Microsoft’s OPM3 Implementation, (2010) available at http://www.opmexperts.com/microsoft_opm3_case_study.html [Google Scholar]
  21. Software Engineering Institute, Benefits of CMMI within the defense industry (Carnegie Mellon University, 2010) [Google Scholar]
  22. R. Stake, Case Studies (N. Denzin & Y. Lincoln. (eds.), Strategies of Qualitative Inquiry, Sage, 2010) [Google Scholar]
  23. R. Yin, Case Study Research: Design and Methods (Sage, 1994) [Google Scholar]
  24. B. Gillham, Case Study Research Methods (2001). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.